The Bathroom – Day One
Work has begun on the shower. They’ve ripped out the tile and got to the damaged section of the wall, and now they have a fairly good idea of how much repairs are needed to make things right.
The workers should be able to keep everything the same on the left, with the exception of new copper pipes for the plumbing. The tub will be replaced, too.
This part, however, makes me go eek:
This is the damaged wall. The water has affected the wood up to about the four foot mark, which is a lot more extensive than I imagined it to be. Actually, I should honestly say that I did imagine it this way; I just hoped that it wouldn’t be true.
The contractor tells me the water has gone through to the other side of the double-wall, particularly the corner section. We took a peek at the bedroom-side and sure enough, we found cracks in the paint around the same level as revealed on the bathroom-side. I never noticed this before, but when I push on the bedroom-side wall, there is a noticeable “give” that makes my wallet scream.
Tomorrow they plan to remove the tub and start repairs on the wall. It will be a noisy, dirty, dusty, and expensive affair.