September 2026
S M T W T F S
 12345
6789101112
13141516171819
20212223242526
27282930  

~ Search ~

~ Archives ~

~ Favorite Fears ~

~ Wishful Fears ~

Sidebar Decoration, Bottom
end of article summary

The good, the bad, the updates

end of article summary
11 September 2009
date decoration

What better way to celebrate freedom than by doing all the “meh” you wanted me to do? It’s what any true patriot should hope for. Today that “meh” includes updates on my activities since the last time I spoiled your evening with my shenanigans.

Continued ~

Article #697 by CancerMan on 11 September 2009 @ 16:46
This article categorically filed under Fear the Life, Fear the Photos
Scientifically tagged with , , ,
Comments Off on The good, the bad, the updates

end of article summary

The Bathroom – Day Eight

end of article summary
25 April 2009
date decoration

The bathroom fixtures were finally installed. One more step closer to completion!

We went with Grohe because of reports of durability, and many positive reviews. And yeah, those pluses mean higher costs. The faucets are from the Talia line, with matching Volo handles. We didn’t install any type of aerator, so the water comes out quite strong. We’ll have to make sure we don’t waste any.

Bathroom - Day Eight (A)

The sink

Inside the tub, we have a Grohe Tempesta handshower system, with Talia valve trim and tub filler. We found out that normally people have a fixed shower head, with a diverter to a handheld, but my bathroom never really had that feature to begin with. I don’t think I’ll be missing out.

Bathroom - Day Eight (B)

The shower and tub

The toilet is a 1.6 gallon flusher, from Toto. Previously we had a 40-year-old behemoth that probably used upwards of 5 gallons per flush, 10 if you laid a real stinker. The new toilet seems much more powerful, at a fraction of the resources.

Bathroom - Day Eight (C)

The toilet

I only wish that fraction extended itself to my wallet. I haven’t calculated how many flushes it would take to balance out the high price for the toilet, but I intend to sit on that throne until I am a dessicated shell of a man, held together only by sheer force of will.

And maybe constipation.

Article #553 by CancerMan on 25 April 2009 @ 8:35
This article categorically filed under Fear the Life, Fear the Photos
Scientifically tagged with , , , ,
Comments Off on The Bathroom – Day Eight

end of article summary

The Bathroom – Day Six and Seven

end of article summary
09 January 2009
date decoration

It’s all starting to come together!

Day Six of the bathroom remodeling actually took place Christmas Eve, when the new cabinets were installed.

Bathroom - Day Six

Bare cabinets

The old countertop was removed, hence the traces of glue and paper backing against the wall.  That little block under the mirror is just to hold the whole thing up, since before it was resting on the backsplash.  What’s new with this countertop are the extra shelves to the left to give us more storage space, while still retaining a bit of leg room in the vanity area (not that any of us actually used that area for vanity purposes).

Day Seven was today, when the Corian countertop and shower walls were installed.  The nice-ness is freakin’ awesome!

Bathroom - Day Seven (A)

Corian shower walls

Bathroom - Day Seven (B)

Corian counter and sink

The shower walls go all the way up to the ceiling and lie flush with the window, ensuring a somewhat-secure seal. The installation couldn’t wrap into the window frame given the way the hardware was designed, so this is the next best thing.

The sink is part of the counter top, making it a smooth transition that will be easy to clean.  We also requested that the backsplash be made “one-piece” with the counter so that no water can stain the grout.

The plumber has already been notified that the fixtures can be installed.  We’ll also get a nice finish of dark-colored Formica placed on the cabinets, for a contrast against the light-colored counter and walls.  As for the floor, we’ll probably install the same design so that it matches the rest of the house.

Article #486 by CancerMan on 09 January 2009 @ 19:10
This article categorically filed under Fear the Life, Fear the Photos
Scientifically tagged with , , , ,
Comments Off on The Bathroom – Day Six and Seven

end of article summary

The Bathroom – Day Five

end of article summary
10 November 2008
date decoration
Bathroom - Day Five

Drywall!

The Corian shower walls will go over this, and stretch all the way up to the ceiling.  Hopefully we won’t have to worry about water getting into the wood after that.

Corian is what we’ll also have for the bathroom counter, but we won’t need drywall on the cabinets for that.  I think.

People might notice that although this is the fifth day of work on my bathroom, it’s been over a month since the last time we visited this sanitary sanctum in progress.  Situations like these, I just remember what my coworker said about construction, particularly when done by family or friends:

“Good.  Fast.  Cheap.  Pick any two.”

Article #460 by CancerMan on 10 November 2008 @ 17:05
This article categorically filed under Fear the Life, Fear the Photos
Scientifically tagged with , , , ,
~ 1 Comment ~

end of article summary

The Bathroom – Day Four

end of article summary
06 October 2008
date decoration

The new Americast tub was installed today.

Bathroom - Day Four (A)

The tub

This type of tub doesn’t have legs and relies on a 2×4 secured against the wall underneath the back ledge.  Apparently that length of wood is what supports the tub, along with the wall itself.  The plumber told me something about putting some kind of material underneath in the space between the tub and the concrete base, but I didn’t quite understand whether it was for support to dampening the sound of water against the surface.

One thing I was not aware of when I bought this tub was that there are certain no-nos when it comes to cleaning it.  I can’t use Brillo pads or abrasive cleaners like Comet.  Instead I have to use a sponge or rag with mild cleansers such as dish-washing liquid or Liquid Tide.  There are also peculiar strips on the bottom of the tub, whose documentation indicates they are to prevent slippage, but apparently they also prevent dirt from being cleaned off.  The plumber said that no matter what I do, eventually these now-semi-invisible areas will become quite noticeable.  I can only hope the staining matches the walls, to make it look intentional, you know?

The plumber also installed new copper pipes for the water, as well as the Grohe pressure valve designed to regulate it all.

Bathroom - Day Four (B)

The shower pipes

The line for the shower head is off-center to accommodate the handshower system we purchased. The plumber will install the bar in the center so that the shower head is situated in a more-natural position.  He remarked that most showers actually have a fixed head and a separate hand-shower, using a diverter valve to determine which one water will flow through.  I told him that my experience has always been with a single outlet for water, whether it was a fixed shower head or a hand-shower.  He didn’t seem that impressed.

Here’s a closeup of the shower valve.

Bathroom - Day Four (C)

The pressure valve

This thing is super expensive, but it’s supposed to last a long long time, so hopefully it will pay for itself in the duration.  I don’t know if that black cap will stay on, but on the outside, this particular trim will cover it.

From what I can understand, the pressure valve will maintain a constant flow, and the handle is used more to determine the temperature.  This is slightly different than what I am used to, in which the handle controls the flow and a separate knob (often set in the handle) controls how hot it gets.  I’m sure I won’t mind either way.

Article #443 by CancerMan on 06 October 2008 @ 20:02
This article categorically filed under Fear the Life, Fear the Photos
Scientifically tagged with , , , ,
Comments Off on The Bathroom – Day Four

end of article summary

The Bathroom – Day Three

end of article summary
01 October 2008
date decoration

The materials for the wall repair arrived, and much work was accomplished.

Bathroom - Day Three (A)

New wall, base

There’s still a bit of work left at the base, but it is progress nonetheless.  I’m particularly happy about the replacement of that wooden beam.

Bathroom - Day Three (B)

New wall, top

The redwood planks used to repair the wall were pre-cut.  I guess the size has changed over the last 40 years, because it obviously does not line up the same.  I am not too worried about that, however, since this section will be covered by the shower tile that will reach all the way to the ceiling.

Bathroom - Day Three (C)

Closet floor

The workers also replaced the rotten section of floor in the bedroom closet next door.  The gray stuff is a protective sealant that will be applied along the edge, in the hopes that it will prevent future damage.  We also sealed the exterior.

Bathroom - Day Three (D)

Exterior wall, base

This is the area I referenced earlier, where the slope and years of rain are strong contenders for being the cause of all this trouble.  The rain gutter spout right next to it probably doesn’t help.  We plan to do something about that, perhaps get a cheap plastic “extension” or some kind of diverting funnel to move the water away from the house.

Maybe drop it into the neighbor’s yard.

Article #439 by CancerMan on 01 October 2008 @ 18:19
This article categorically filed under Fear the Life, Fear the Photos
Scientifically tagged with , , , ,
Comments Off on The Bathroom – Day Three

end of article summary

The Bathroom – Day Two

end of article summary
27 September 2008
date decoration

A dumpster arrived for all the stuff we’re removing.

Bathroom - Day Two (A)

Dumpster

It’s more than big enough for the bathroom, which hopefully does NOT translate into “throw anything else we don’t want in there,” since I’m paying by weight.  Someone was doing this the last time we had a dumpster, and while the difference was negligible, it still came out of my pocket.  I’m looking at YOU, neighbor!

As the rotten wood was cut away, more and more of the water damage became apparent.  Particularly disturbing is this area, where a post would be to shore up the ceiling in this area.  This, too, will have to be replaced, and it definitely calls for more work.

Bathroom - Day Two (B)

Missing: Wall

The “plate” under the vinyl floor, which separates the house from the concrete foundation, is also damaged.  The wood has become so rotten that nails cannot stick to it, and for who-knows-how-long, the exterior wall has not been attached to the floor!

Bathroom - Day Two (C)

Bath and closet floor

We are starting to suspect that the water damage originated from the outside.  Years and years of rain pooling outside, instead of draining away from the house, was instead soaked upwards from the planks there.  Maybe such a thing doesn’t happen often, but I think over the course of four decades, even a millimeter of rain seeping into the house would eventually deteriorate everything to the extent we see here.

In fact, the concrete outside has a slight, almost imperceptible slope down towards the house.  It’s something that I never noticed before, but I’m certain that water would pool near the base given enough water, and we’ve had enough heavy rains to make a fair guess as to this being the root cause of all our problems.

I was also wrong about the house all this time; it is not double-wall, it is single-wall construction.  I no longer remember who or what it was that gave me the wrong impression, but it could be that I heard it a long long time ago and never questioned it, because it didn’t seem like an important detail.

Article #426 by CancerMan on 27 September 2008 @ 7:45
This article categorically filed under Fear the Life, Fear the Photos
Scientifically tagged with , , , ,
Comments Off on The Bathroom – Day Two

end of article summary

The Bathroom – Day One

end of article summary
24 September 2008
date decoration

Work has begun on the shower.  They’ve ripped out the tile and got to the damaged section of the wall, and now they have a fairly good idea of how much repairs are needed to make things right.

Bathroom - Day One (A)

Gutted shower

The workers should be able to keep everything the same on the left, with the exception of new copper pipes for the plumbing.  The tub will be replaced, too.

This part, however, makes me go eek:

Bathroom - Day One (B)

Water damage

This is the damaged wall.  The water has affected the wood up to about the four foot mark, which is a lot more extensive than I imagined it to be.  Actually, I should honestly say that I did imagine it this way; I just hoped that it wouldn’t be true.

The contractor tells me the water has gone through to the other side of the double-wall, particularly the corner section.  We took a peek at the bedroom-side and sure enough, we found cracks in the paint around the same level as revealed on the bathroom-side.  I never noticed this before, but when I push on the bedroom-side wall, there is a noticeable “give” that makes my wallet scream.

Tomorrow they plan to remove the tub and start repairs on the wall.  It will be a noisy, dirty, dusty, and expensive affair.

Article #423 by CancerMan on 24 September 2008 @ 14:56
This article categorically filed under Fear the Life, Fear the Photos
Scientifically tagged with , , , ,
Comments Off on The Bathroom – Day One

end of article summary

The Bathroom – Prequel

end of article summary
23 September 2008
date decoration

As referenced in this post, our bathroom will be overhauled extensively, much to the disruption of our daily routine.  I think this is the perfect time to document the evolution of this sanitation sanctuary.

Here is the bathroom pre-renovation:

Bathroom - Old

Before!

Yes, we have a phone in there.  It’s rather convenient for us, perhaps not so much for the caller.

This is the reason for the renovation:

Wall Damage - Bath

Damage, Bath

Wall Damage - Bedroom

Damage, Closet

Now how is that conducive to basic health and hygiene?  The second picture is from the bedroom next door, in the closet.  As you can see, the damage is much more extensive, and perhaps representative of what’s going on inside the double-wall construction.  If the wood has rotted away this much, it’s a sure bet that some nastiness is brewing within the bowels of the bathroom.

Hopefully the work will not reveal other problems hidden beneath.  This is already costing me.

Here is a preview of things to come:

New Bathroom Fixtures

New bath fixtures

Discuss amongst yourselves whether or not I’ll add the computer or upright fan.  Who knows?  Perhaps browsing the dregs of the internet requires some adequate ventilation.

Article #422 by CancerMan on 23 September 2008 @ 16:58
This article categorically filed under Fear the Life, Fear the Photos
Scientifically tagged with , , , ,
Comments Off on The Bathroom – Prequel